Featured Projects

Newark airport shutterstock_23096371

EWR Navigational Aids

Owner: The Port Authority of NY & NJ

Project Cost: $13,000,000.00+

Project Description: This work includes the upgrades and improvements to navigational aids for runways 22L, 22R, and 4L at Newark Liberty International Airport, Newark, New Jersey.

Newark Airport

Newark Perimeter Intrusion Detection System

Owner: Raytheon Technical Services Company LLC

Project Cost: $5,000,000.00+

Project Description: This project includes, the making of a high level security system at Newark and Teterboro Airports consisting of underground duct bank systems, cameras, and fence sensors.

terminalb

EWR 434.070 Newark Airport Terminal B

Owner: PANYNJ / Continental

Project Cost: $3,000,000.00+

Project Description: This work includes the relocation of main feeders throughout the parking area of Newark Airport. In addition it includes the installation of all new entrance gates, exit gates, a fiber control system, and a traffic intersection.

Hudson county

14th Street Viaduct

Owner: County of Hudson/ JH Reid

Project Cost: $2,700,000.00+

Project Description: This work includes the replacement of the 14th Street viaduct over Conrail and local streets in the City of Hoboken and City of Union City, County of Hudson, New Jersey.

side-slide4

Switch House 2

Owner: The Port Authority of New York and New Jersey

Project Cost: $2,700,000.00+

Project Description: This work includes the installation of a complete new electrical service, generator, SCADA system, and regulators at Newark Liberty International Airport, New Jersey. The work under this contract consists generally of modifications to existing power substation building, diesel emergency generator, enclosure ductbanks, and cables. This work also includes demolition and disposal of existing equipment including electrical and mechanical boards and components, emergency generator and underground storage tank, emergency trailer-mounted generator and load bank restoration and site related work at Switch House No. 2 in EWR and the vicinity thereof at.

9092020-large

Terminal B3

Owner: The Port Authority of New York and New Jersey

Project Cost: $2,200,000.00+

Project Description: This work includes the installation of new feeders in a cable bus system, new electrical gear, a fire alarm system, and a sprinkler system. The work under this contract consists generally of replacement of existing primary switchgear and underground primary feeder cables for the switchgear room at Terminal B - Satellite B3 and B3 Connector and the vicinities thereof at Newark Liberty International Airport, New Jersey.

Highway construction shutterstock_141116995

NJ Turnpike Interstate 6-9 .201

Owner: NJ Turnpike Authority/ South State

Project Cost: $2,000,000.00+

Project Description: This work consists of the construction of two new outer roadways, each consisting of three 12' lanes and a 12' right shoulder from milepost 52.3 to 53.4 in the Township of Mansfield and Bordentown in Burlington County, New Jersey. The project also includes the construction of two new Turnpike bridges over Route US 206, the maintenance U-turn at Milepost 53.3, retaining walls, sign structures, drainage, and storm water management facilities, under bridge and tunnel lighting, ITS, U-Turn demolition, partial reconstruction of bridge over Route US 206, six building demolitions, and utility work.

18A

New Jersey Turnpike Exit 18W

Owner: New Jersey Turnpike/ Ferrierra

Project Cost: $2,630,000.00

Project Description: This work includes the installation of a new service for the toll plaza, generator, highway lighting, temporary highway lighting, ITS, and VMS signs all in the vicinity of the New Jersey Turnpike Exit 18W.

terminalb

Terminal B Work Orders

Owner: The Port Authority of NY & NJ

Project Cost: $2,578,000.00

Project Description: The work under this project generally consists of miscellaneous facility improvement, including repair, rehabilitation, demolition, and construction of various interior and exterior building systems, extensive site work, and maintenance and protection of pedestrian and vehicular traffic.

stewart

Stewart Airport

Owner: The Port Authority of New York and New Jersey

Project Cost: $1,900,000.00+

Project Description: The work under this project consists generally of the replacement of aeronautical approach lighting, including but not limited to fixtures, wiring, duct banks and related work at Runway 9 and the vicinity thereof at Stewart International Airport, Orange County, New York.

Road paving shutterstock_148462898

Route 22 and Chimney Rock Road

Owner: Somerset County/ Anselmi & DeCicco

Project Cost: $1,800,000.00+

Project Description: This work consists of the construction of the interchange at US Route 22 & Chimney Rock Road including paving, grading, and structures, in Bridgewater Township, Somerset County, New Jersey.

njroute23

NJ Transit Route 23 Park and Ride

Owner: New Jersey Transit / JH Reid

Project Cost: $1,500,000.00+

Project Description: This work includes parking lot lighting, intelligent traffic systems, traffic intersections, camera and speaker systems, and computerized bus system at the New Jersey Transit Route 23 Park and Ride.

Station 10 Penn Station shutterstock_147511622 (1)

Switching Station 10

Owner: The Port Authority of NY & NJ

Project Cost: $1,200,000.00+

Project Description: This project consists of the replacement of Switching Station No. 10 in Newark Penn Station, Newark, New Jersey. The work for this project includes performing removal of existing switching station equipment, furnishing, installation, and commissioning of DC switchgear, walk in enclosure, communication, security systems, and related work in Switching Station No. 10.

meadowlands shutterstock_118000150

Phase 4 Meadowlands Signals

Owner: New Jersey Meadowlands Commission

Project Cost: $1,165,000.00+

Project Description: This work includes installation of the Meadowlands Adaptive Signal System for traffic reduction phase 4 in the Borough of Palisade Park, Borough of Ridgefield, & Borough of Fairview, Bergen County, Township of North Bergen, & Jersey City, Hudson County, New Jersey.

Overpass shutterstock_147174086

NJ Turnpike Interstate 7a

Owner: NJ Turnpike Authority/ IEW Construction

Project Cost: $1,000,000.00+

Project Description: This project includes reconstruction of the Edgebrook Road and Robbinsville-Allentown Road bridges over the Turnpike, and the construction of the portions of Ramp TN and Ramp TN over Route I-195 from Mile 59.7 to Mile 60.9 in The Township of Robbinsville, Mercer County, New Jersey.

Telephone pole shutterstock_3392718

Marine Terminals- Highway Advisory Radio

Owner: The Port Authority of NY & NJ

Project Cost: $1,000,000.00+

Project Description: This work includes the installation of Highway Advisory Radio System with wireless communications link including wiring on utility poles, roadside sign structures, conduit and cable on bridge structures at Port Newark/Elizabeth Marine Terminal, New Jersey.

4b046187ca5da.main_p

New Jersey Turnpike Newark Bay Bridge Project

Owner: New Jersey Turnpike Authority

Project Cost: $950,000,000.00

cell tower shutterstock_113452546

Pyramid Network Services

Owner: Pyramid Network Services

Project Cost: $1,006,000.00

Project Description: This work includes installation of cell towers at various locations throughout the state of NJ. This includes all civil and site work for the cell towers.

Orange_County_(NY)_Airport

Orange County Airport

Owner: Orange County

Project Cost: $600,000.00+

Project Description: The work under this project consists of security improvements at Orange County Airport in Orange County, New York. The work included, but was not be limited to chain link fencing, 8' tall with 1' barbed wire, automated sliding gates with access control, Pan Tilt Zoom (PTZ) cameras (wall mounted and pole mounted), pole for lighting and camera, DVR monitoring system, and card badging system.

Newark airport2

Cruz Warehouse Flood Repairs

Owner: Cruz Enterprises

Project Cost: $220,000.00+

Project Description: This work includes the repair of Cruz Warehouse after damage from Hurricane Sandy.

Prepare to stop sign shutterstock_121551643

South Summit Ave over Rt. 80

Owner: NJ Dept of Transportation/ Creamer Sanzari

Project Cost: $280,000.00+

Project Description: This work includes standard roadway construction, traffic control, and bridge construction located on South Summit Avenue over Route I-80, Ramp L, Route 17 Southbound, and South Summit Avenue over Route 17 Southbound.

port authority shutterstock_2230219

EWR/ TEB Work Orders

Owner: The Port Authority of NY & NJ

Project Cost: $4,500,000.00

Project Description: The work under this project generally consists of miscellaneous facility improvement, including repair, rehabilitation, demolition, and construction of various interior and exterior building systems, extensive site work, and maintenance and protection of pedestrian and vehicular traffic.

Water pumping Station control panel shutterstock_24559297

Kraft Inc.

Owner: Mondelez Global/ Kraft

Project Cost: $31,000.00

Project Description: This work includes the electrical testing and maintenance at the Kraft facility in Fair Lawn, New Jersey.

Traffic Survaillance shutterstock_146564798

Meadowlands Traffic Surveillance

Owner: New Jersey Department of Transportation

Project Cost: $999,000.00

Project Description: This work includes installing traffic surveillance systems in various municipalities in Bergen, Essex, Hudson, and Passaic Counties.

plaunderville

Plauderville Rail Station

Owner: NJ Transit / Anselimi and DeCicco

Project Cost: 1,576,000.00

Project Description: The work for this contract generally consists of furnishing all labor, materials, equipment, tools and incidentals necessary to construct and complete the project, including, but not limited to, the following, mobilization, site clearing, preparation, and selective demolition work, site work improvements, platform and structure foundations, prefabricated composite platform manufacture and installation, canopies and railings, electrical power, lighting, and communications systems, HVAC and plumbing systems, Arts in Transit, and cleanup and demobilization.

william_paterson

WPU Solar

Owner: William Paterson University/ Sundurance

Project Cost: $2,112,000.00

Project Description: The work includes the installation of the largest solar energy facility at William Paterson University in New Jersey. The project can also be described as a 3.5 MW solar energy project comprised of rooftop and parking lot solar installations on the WPU campus in Wayne, New Jersey.

Additional Projects

Old Trenton Road

Project Details:

  • This work includes intersection improvements located at Old Trenton Road and Robbinsville-Edinburg Road, in West Windsor Township, Mercer County, New Jersey.

Owner: County of Mercer/Lucas Construction

Contract Amount: $210,000.00+

Commencement: August, 2013

Completion: March, 2014

Exxon Mobil Lubes Plant

Project Details:

  • Work includes providing a new storm water pumping station control panel for ExxonMobil Environmental services in Bayone, NJ.

Owner: Exxon Mobil/ Conti Enterprises

Contract Amount: $227,750.00

Commencement: May, 2013

Completion: February, 2014

NJ Transit Bloomfield Ave

Project Details:

  • Construction of a mobile Traffic Signal Priority system for New Jersey Transit bus Fleet operating on Bloomfield Ave

Owner: NJ Transit

Contract Amount: $467,680.00

Commencement: August, 2009

Completion: February, 2011

Expressrail EP-384.061

Project Details:

  • The work under this contract consists generally of construction of second lead track into Express rail- Elizabeth, reconstruction of existing lead track, construction of rail bridge over McLester Street, reconstruction of Bay Avenue, construction of new South Bay Avenue roadway, utility work and related work at the construction site.

Owner: The Port Authority of New York and New Jersey D'Annunzio and Sons

Contract Amount: $2,200,000.00

Commencement: February, 2007

Completion: October, 2011

Park Ave over Route 3

Project Details:

  • Traffic Intersection
  • Time Travel System
  • CCTV System
  • Varible Message Sign System
  • All work was intergrated into the NJDOT

Owner: NJDOT / Anselmi and DeCicco

Contract Amount: $1,160,000.00

Commencement: October, 2008

Completion: October, 2012

Route 4 Pedestrian Improvements

Project Details:

  • This work includes pedestrian mobility improvements for route 4 in the Township of Teaneck, County of Bergen, New Jersey.

Owner: New Prince

Contract Amount: $80,000.00

Commencement: March, 2013

Completion: January, 2014

Journal Square Work Order 17

Project Details:

  • This work consists of a high level security system including card swipe systems, camera systems, and a hydrolic gate system.

Owner: PANYNJ / Railroad Constrution

Commencement: October, 2007

Completion: April, 2011

Lakehurst C17 Landing Zones

Project Details:

  • This work includes aircraft lighting and lighting control systems at the Lakehurst C17 landing zones for the Army Core.

Owner: Army Core Eng / Conti

Commencement: December, 2007

Completion: March, 2009

Newark Airport, Clean Slate

Project Details:

  • This work includes cathodic protection on the fuel line throughout Newark Airport Terminal Area.

Owner: PANYNJ / Holt Constrution

Commencement: May, 2009

Completion: June, 2010

Rt. 120/Rt. 3 Xanadu

Project Details:

  • Highway lighting VMS signs

Owner: JF Creamer / NJDOT

Commencement: February, 2008

Completion: August, 2010

Teterboro TEB 101

Project Details:

  • This work includes construction of priority protective measures, lighting vault, and electrical room at the Teterboro Airport in New Jersey.

Owner: Port Authority of NY & NJ

Commencement: September, 2013

Completion: March, 2015

Lincoln Tunnel Travel Time System Upgrades

Project: LT-244.241

City/State: New Jersey & New York

Project Details:

Owner: The Port Authority of NY & NJ

Commencement: October, 2013

Completion: January, 1970

NJ Transit – Secaucus Transfer

Project: New County Road

City/State: Secaucus, NJ 

Project Details:

  • Roadway & Bridge Lighting

Owner: NJ Transit

Contract Amount: $860,000

Commencement: February, 2013

Completion: October, 2003

Role: Subcontractor

Rehabilitation of Taxiway “P”

City/State: Newark Airport, Newark NJ

Project Details:

  • Runway lighting

Owner: Port Authority NY/NJ

Contract Amount: $1,500,000.00

Commencement: January, 2003

Completion: October, 2003

Role: Subcontractor

Newark Elizabeth Rail Light Project

Project: NCS Broad Street Extension Project

City/State: Newark, NJ

Project Details:

  • Newark City Subway Extension
  • Rail System Integration
  • Traffic Signal Integration

Owner: NJ Transit

Contract Amount: $8,231,835.00

Commencement: April, 1994

Completion: January, 2007

Role: Subcontractor

Port Imperial Intermodal
Ferry Terminal
*Award Winning Project

City/State: Weehawken, NJ

Project Details:

  • New Construction of Ferry Terminal

Owner: Port Authority NY/NJ

Contract Amount: $2,700,000.00

Commencement: July, 2004

Completion: June, 2006

Role: Subcontractor

EWR 154.332 Work Order #8

City/State: Newark Liberty Airport

Project Details:

  • Security Enhancements for Entry and Exit Gates

Owner: Port Authority NY/NJ

Contract Amount: $1,015,210.00

Commencement: May, 2005

Completion: March, 2007

Role: Subcontractor

Continental Global Gateway

Project: Newark Liberty Airport

Project Details:

  • Traffic Intersections
  • Mini Load Centers Fiber Optic cabling
  • Lift/Pump Stations

Owner: Port Authority NY/NJ

Contract Amount: $1,100,000.00

Commencement: June, 2000

Completion: December, 2012

Role: Subcontractor

CTA Bridge

City/State: Newark Liberty Airport, Newark, NJ

Project Details:

  • High Mast Lighting
  • Toll Plaza Control Wiring- Teledata & Fiber-Optic
  • Parking-lot Amenities

Owner: Port Authority NY/NJ

Contract Amount: $3,200,000.00

Commencement: February, 2001

Completion: December, 2003

Role: Subcontractor

Port Elizabeth Intermodal
Transfer Facility

City/State: Tripoli and Formosa Street Elizabeth, NJ

Project Details:

  • Design/Build high mast lighting
  • Rail switching systems

Owner: Port Authority NY/NJ

Contract Amount: $898,000.00

Commencement: February, 2003

Completion: February, 2004

Role: Subcontractor

EWR 922.200 Replacement
of High Mast

City/State: Light Towers, Newark Liberty Int. Airport

Project Details:

  • Replacement of High Mast Towers at Newark Liberty Int. Airport

Owner: Port Authority NY/NJ

Contract Amount: $3,148,755.00

Commencement: November, 2004

Completion: August, 2006

Role: General Contractor

Roadway and Area Lighting Upgrades

Project: Contract No. T200.032

City/State: NJ Turnpike Milepost 0.0 to 122.0

Project Details:

  • Entire length of the New Jersey Turnpike
  • Electrical maintenance work

Owner: Port Authority NY/NJ

Contract Amount: $474,713.00

Commencement: January, 1970

Completion: January, 1970

Role: General Contractor

General Site Project,
Various Work Orders

City/State: Newark Liberty Airport

Project Details:

  • Various electrical projects

Owner: Port Authority NY/NJ

Contract Amount: $950,000.00

Commencement: December, 2001

Completion: September, 2003

Role: Subcontractor

Glaxo – Smithkline

City/State: Industrial South Clifton, NJ

Project Details:

  • Control wiring
  • Manufacturing installations
  • Installation of High Voltage Sub-Station

Owner: Glaxo SmithKline

Contract Amount: $950,000.00

Commencement: May, 2004

Completion: June, 2006

Role: General Contractor

Intersection Improvements,
Waldwick, NJ

City/State: Waldwick, NJ

Owner: County of Bergen

Contract Amount: $580,600.00

Commencement: July, 2006

Completion: January, 2007

Role: General Contractor

Nabisco – Kraft Facilities

City/State: Route 208 Fair Lawn, NJ

Project Details:

  • Wiring of line equipment
  • Parking lot lighting
  • Hi-Bay lighting
  • Maintenance

Owner: Nabisco / Kraft

Contract Amount: $200,000.00

Commencement: June, 2009

Completion: April, 2009

Role: Subcontractor

Taxiway “Z”

City/State: Newark Liberty Airport Newark, NJ

Project Details:

  • Runway Lighting

Owner: Port Authority NY/NJ

Contract Amount: $300,000.00

Commencement: June, 2003

Completion: October, 2003

Role: Subcontractor

Frank R. Lautenberg Intermodal Facility Expansion

Project: Frank R. Lautenberg Intermodal Facility Expansion

City/State: Secaucus, NJ

Owner: NJ Transit

Commencement: January, 1970

Completion: January, 1970

Stewart Airport Airfield Signs Project

Project: Stewart Airport Airfield Signs Project

City/State: Orange County, NY

Owner: The Port Authority of NY & NJ

Commencement: January, 1970

Completion: January, 1970